    Building/Level 3 surveys: how long do they take?

    A Building survey/Level 3 is the most comprehensive and detailed inspection of a property's structure and condition. Buyers use it to find the problems and defects that affect what a home is worth, and what it will cost to put right. Here is how long it takes, and what happens along the way.

    See Expected Timings
    Surveyor carrying out a detailed building inspection

    What it is

    The most extensive type of property survey.

    A Building survey/Level 3 is a thorough analysis of a building's condition, structure and health, carried out by a professionally qualified surveyor.

    What the inspection covers

    Everything from a visual inspection of the building to an overview of the services within the property's boundaries, including electricity, gas and water. Plumbing, heating and drainage are inspected too, alongside a detailed search of roof spaces and the surrounding grounds.

    What it gives you

    Building Survey/Level 3 surveys suit most homes, and are used particularly on older buildings, non-standard construction and heavily renovated properties. By highlighting defects that need fixing, the survey can reveal costly hidden repairs, support a better sale price and provide genuine peace of mind.

    Expected timings

    Around four hours on site, and about five working days for the report.

    Most Building Survey/Level 3 surveys take roughly four hours to carry out, split between two hours on the internals and two hours on the externals. In some cases a surveyor needs up to eight hours, depending on the size and condition of the property and any issues with access. The longer timeframe, and the cost that goes with it, reflect the fact that this is the most thorough survey.

    Building Survey/Level 3

    Time on site: Around 4 hours, up to 8 hours

    Report: Approximately 2-3 working days

    Typically two hours inside and two hours outside, extending towards a full day on larger, older or harder-to-access properties.

    HomeBuyer/Level 2

    Time on site: Between 2 and 4 hours

    Report: Approximately 2-3 working days

    Quicker than a Building Survey/Level 3 because the inspection is less intrusive, though age, condition and access still move the timings.

    What's included

    Six inspections that make up the working day.

    A Building survey/Level 3 goes deeper than other home surveys, covering the materials used, the defects found, remedial advice and long-term maintenance issues. Utility services are not tested as such, but they are observed in normal operation and any potential issues are flagged in the final report.

    Floor inspection

    All exposed floors and their surfaces are inspected, including lifting the corners of carpets and coverings where that is feasible. Excessive deflection is checked with a heel-drop test, and the subfloor may be examined with a head-and-shoulders inspection where it is safe to do so.

    Roof inspection

    The roof space is accessed where it sits no more than three metres above floor level, and the whole roof structure is visually inspected for areas at greater risk of damage and deterioration. Sections of thermal insulation may be lifted, where safe, to check the ceiling beneath.

    Window inspection

    Windows are opened where the owner has given permission, it is safe to do so, and locks and keys are available. The surveyor attempts every window to check condition and flag defects, and reports back on any that could not be accessed.

    Drainage and inspection chambers

    Accessible inspection chamber covers are lifted to check drains and septic tanks, provided that can be done safely and without causing structural damage. Drains are then observed in normal use so condition and potential issues can be assessed.

    Services inspection

    Gas, electricity and water systems are visually inspected in normal operation wherever that is safe and non-damaging. The surveyor may ask for the heating or an extractor fan to be switched on, but service installations and appliances are not tested.

    Grounds inspection

    The grounds within the property boundaries are visually inspected, sometimes from adjoining public land where that gives a fuller view of the plot. A grounds inspection is also used to examine roof areas that cannot be seen from a window or elsewhere in the property.

    Detailed survey report being prepared after a property inspection

    After the inspection

    The report is where the four hours
    on site turn into decisions.

    Once the inspection is complete, the surveyor compiles a thorough report based on their findings.

    The report flags every issue and defect identified, and makes general recommendations on priorities and timescales for the work and repairs needed. Where you have chosen it as an optional service, it can also include a cost estimation for that work. Allow approximately 2-3 working days from the inspection for a detailed Building survey/Level 3 report to reach you.

    When to choose one

    Recommended for older, unusual or heavily altered properties.

    If you are unsure which survey you need, a full structural Building/Level 3 survey is a safe choice for any property. Inspections are mostly completed in eight hours or less, and cover every aspect of the building.

    Older properties

    Homes of a century or more, where age-related movement, materials and past repairs all deserve close inspection.

    Non-standard construction

    Buildings put up with unusual materials or methods, which behave differently to conventional brick and block.

    Altered or renovated homes

    Properties where major alterations have already been made, or where you are planning renovations of your own.

    The benefits of a Level 3 survey

    • Defects, damp, legal issues and hidden problems identified before you commit.
    • Costly repairs uncovered while you can still act on them.
    • Evidence to negotiate the sale price with the seller.
    • A clearer basis for choosing insurance that reflects the property's condition and risk.
    • Greater confidence in the investment you are about to make.
    • A thorough assessment of older, unique or heavily altered homes.

    Common questions

    Survey timings at a glance.

    How long does a Level 3 survey take?

    Most Level 3 surveys take around four hours on site, roughly two hours for the internals and two hours for the externals. On larger or older properties, or where access is difficult, it can take up to eight hours. The written report usually follows around five working days later.

    How long does a Level 2 survey take?

    A HomeBuyer/Level 2 survey, formerly known as a Report, usually takes between two and four hours to complete. Timings vary with the age and condition of the property and with any access restrictions.

    How long after the inspection do you get the report?

    Allow approximately five working days from the inspection for a detailed Level 3 report to be compiled. The report flags the issues and defects found and makes recommendations on priorities and timescales for the work needed.

    Booking a Building survey/Level 3 survey

    Do you need a Building survey/Level 3 for your next property?

    Tell us about the property and we will confirm the time needed on site, when to expect your report, and whether a Building survey/Level 3 is the right level of detail for what you are buying.

    Compare Survey Types